Construction Method
The constraint of only an 8 week onsite installation window meant that the project had to be prefabricated off site and then installed extremely quickly.
A process of using a large suspended lifting frame and assembling the sculpture from the top down in 3m slices was devised and simulated at scheme design stage and subsequently adopted verbatim by the contractor.